It's not what you see that matters—it's what you don't.
Start Your Project
Start Your Project
  • © 2002 Pro Gc 215-853-8202 Profesional General Contractor LIC#PA071659 Email 0

Start Your Project

Hardwood & Laminate Flooring Experts

Not all flooring installs are created equal.
We randomize seam staggering across every row—unlike contractors who repeat patterns every few boards. That's lazy workmanship. It shows you don't respect the craft, and it shows in your finished floor.
We do this job because we love it. That mindset runs through every employee and subcontractor we work with.

Concrete Subfloors & Anti-Fatigue Systems
Installing over concrete? Standard underlayment won't cut it.
We install
anti-fatigue cushioning mats beneath your hardwood or laminate—especially critical for basement finishes and ground-level concrete slabs. These mats reduce joint strain for anyone standing at sinks or islands for extended periods. They also provide additional moisture buffering.
This isn't cheap—it adds cost to the project. But for long-term comfort and floor health on concrete, it's essential work.

Soundproofing for Multi-Level Homes
Want to stop the echo?
Rubber underlayment mats deaden impact noise far better than foam alternatives. Critical for:

  • Heel strikes and dress shoes
  • Upstairs bedrooms over living spaces
  • High-traffic hallways where sound carries
Underlayment increases your budget, but it eliminates the clicking and hollow echoes that cheap installs leave behind. You'll notice the difference every time someone walks through the house.

Brand Guidance & Quality Standards
We install flooring from most manufacturers—but only if we're confident in the product quality.
With so many laminate brands flooding the market, let us steer your selection. Our standard: zero callbacks.
Bruce Hardwood Floors remain our top recommendation. In 30+ years on the job, they've proven the most reliable—even when minor moisture exposure occurs. We've seen cheaper brands fail. Bruce holds up.

Acclimation Is Non-Negotiable
All flooring must acclimate onsite for 14 days minimum before installation. Especially now—many manufacturers ship materials that are still too moist from production.
Skip this step and you guarantee problems later: cupping, gapping, warping. We don't cut corners here. Neither should you.




Screenshot 2026-07-21 at 4.06.25 PM

Screenshot 2026-07-21 at 4.20.51 PM

2,0000 Sq. Ft. finished basement

Stacks Image 11

Small Kitchen project for long standing inspector client

Stacks Image 7

Full house rehab project

Stacks Image 5

We do not sell or share customer information with third parties or affiliates for marketing purposes. We do not collect or retain personally identifiable information.

BBB Google Maps